Service Hotline:

+86-137 0285 5825 

You are here:HOME >> Products >> CUT TO LENGTH L...

Products

Products

News

CUT TO LENGTH LINE

Coil Cutting to Length Line Machine

Cut-to-length shearing machine, also known as cut-to-length line, is used for uncoiling, leveling and shearing metal coils into flat materials of required length and stacking.
It is suitable for processing cold-rolled and hot-rolled steel coils, galvanized steel coils, silicon steel coils, stainless steel coils, aluminum coils, etc. into different widths and shearing according to the production requirements of users.

  • This equipment processes the strip coil into the required billets through the processes of uncoiling, straightening and precision cutting.
    It mainly consists of uncoiler, clamp leveler, gauge, cutter, stacker, etc., and is equipped with auxiliary devices such as feeder, side guide device, transition device, conveyor, etc.
    cut-to-length-line
    Workflow of production line
    Unwinding-Flattening-Slitting-Setting Length-Winding Machine
    cut-to-length-CTL-production-machine-line

    High output/throughput and flow through strict tool time minimization and high production speed
    Excellent sheet flatness through the use of ""four-high"" and ""six-high"" straighteners
    Elimination of edge waviness and center snap marks by using a row of back-up rollers on the leveler
    Accurate cutting accuracy and sheet angles
    Low burr by cutting with edge trimmers and cut-to-length shears
    High stacking accuracy by using a separate stacking system
    Gentle handling of highly sensitive surfaces, e.g. in the automotive industry, through special transport and stacking methods
    Material strengths in excess of 1,400 N/mm² and yield strengths up to 1,000 N/mm²

    FAQ
    Q1: How long will you send the proposal and offer?
    We will need about 3~7 days to design the proposal upon collecting all details of the above-mentioned info necessary.


    Q2: When will you tell me the price?
    After confirming all detailed configurations of the machine line, that we are able to make offer for it.


    Q3: How long do you need to produce the machine?
    We need about 3-6 months to produce machine gauges.

  • Or use the form below to contact us:

    *

    *

    *

    *

Online Now #
  • +86-137 0285 5825 
  • sales@kingreal.org
  • jet-clima jet-clima
  • 952688242Sales